dam ›› 2017, Vol. 0 ›› Issue (2): 18-.

Previous Articles     Next Articles

Problems and improvement suggestions for deformation monitoring system of reservoir dam during operation period

YANG Min-gang, LI Zhan-bei and ZHANG Jin-jie   

  1. China Gezhouba Group Testing Co., Ltd.
  • Received:2016-09-24 Online:2017-04-08 Published:2017-04-08

运行期水库大坝变形监测系统常见问题与改进建议

杨敏刚,李战备,张金杰   

  1. 葛洲坝集团试验检测有限公司,湖北 宜昌,443002
  • 作者简介:杨敏刚(1991- ),陕西武功人,助理工程师,主要从事运行期大坝安全监测工作。

Abstract: With more than 80 thousand reservoirs, China has the largest number of reservoirs in the world, most of which are in operation. As an important infrastructure for national economy, the safety of reservoir dams has attracted much attention. Deformation monitoring is an important part of dam safety monitoring, which can directly reflect the deformation and displacement of dam. However, there are various problems with the deformation monitoring system of some reservoir dams during operation. In this paper, these problems and corresponding improvement suggestions are discussed, for reference.

Key words: dam, operation period, deformation monitoring

摘要: 当前我国已成为世界上水库最多的国家,已有8万余座,大部分水库已经处于运行期。水库大坝作为国民经济重要的基础设施,其安全性备受瞩目。变形监测是大坝安全监测重要的一部分,可以较为直观地反映水库大坝的变形位移情况,但有些水库大坝运行期间,变形监测系统会出现各种问题。文章阐述部分水库大坝运行期变形监测系统出现的问题以及改进方案,以供其他单位参考借鉴。

关键词: 大坝, 运行期, 变形监测