dam ›› 2017, Vol. 0 ›› Issue (1): 7-.

Previous Articles     Next Articles

Investigation and classification of geologic hazards and risk control and management for hydropower projects on upper section of Yellow river

ZHANG Yi, LI Ji and WANG Xue-mei   

  1. Yellow River Upstream Hydropower Development Co., Ltd.
  • Received:2017-01-10 Online:2017-02-08 Published:2017-02-08

黄河上游水电工程地质灾害隐患排查分级及风险预控管理

张 毅,李 季,王雪梅   

  1. 黄河上游水电开发有限责任公司,青海 西宁,810008
  • 作者简介:张 毅(1966- ),男,回族,江苏常州人,高级工程师,长期从事水电站大坝运行安全管理工作。

Abstract: Geological hazards of hydropower projects are hidden, sudden and unpredictable. Failures would exert harmful influence on dam safety and people downstream. Combined with the investigation and evaluation of geologic hazards of hydropower projects on upper section of Yellow river, the paper introduces the classification of existing geologic hazards. Moreover, the risk control and management as well as the effect obtained are presented, for reference.

Key words: hydropower project, geological disaster, risk control

摘要: 水电工程地质灾害具有隐蔽性、突发性、不可预见性等显著特点,失事关系到水电站大坝安全和下游人民生命财产安全。结合黄河上游水电工程地质灾害隐患排查与风险评估及预控工作,介绍了水电工程地质灾害隐患风险分级预控的方法及其应用成效,可供其他水电工程借鉴和参考。

关键词: 水电工程, 地质灾害, 风险预控