Seepage treatment of concrete lining in water diversion system of No. 4 unit of Huanglongtan hydropower station

LU Yong and XIAO Wu   

  1. Hubei Huanglongtan Hydropower Plant
  • Received:2016-04-22 Revised:2016-04-27 Online:2016-10-08 Published:2016-10-08

黄龙滩水电站4 号机组引水系统混凝土衬砌段渗漏治理

陆 勇,肖 伍   

  1. 湖北黄龙滩水力发电厂,湖北 十堰,442005
  • 作者简介:肖 伍(1964- ),男,湖北省郧县人,高级工程师,从事发电厂安全生产管理工作。

Abstract: In order to ensure the safe operation of Huanglongtan hydropower station, the seepage of concrete lining section of the diversion system of No. 4 unit was treated. This paper introduced anti-seepage reinforcement of expansion joint, crack, hole and plug of construction adit. Due to the reasonable scheme and fine construction, the leakage treatment had achieved a satisfactory effect.

Key words: Huanglongtan hydropower station, concrete lining, seepage treatment

摘要: 为保障电站安全运行,对黄龙滩水电站4号机组引水系统混凝土衬砌段渗漏进行了治理。介绍了伸缩缝渗水、裂缝渗水、孔洞渗水、施工支洞堵头渗水等缺陷防渗加固处理的方法。由于方案合理、施工规范,渗漏处理取得了令人满意的效果。

关键词: 黄龙滩水电站, 混凝土衬砌, 渗漏处理