Abstract: In order to ensure the continuity, integrity, reliability, timeliness and accuracy of monitoring data, high requirement is set for the construction of monitoring system, which mainly includes construction preparation, on-site instrument examination and calibration, instrument installation, cable connection and protection, data collection and analysis and etc.
Key words: geotechnical engineering, monitoring instruments, cable connection, data collection
摘要: 为了保证监测数据的连续性、完整性、可靠性、及时性和准确性等,对监测施工提出了较高的要求。监测施工主要包括施工前准备、仪器现场检验率定、监测仪器安装、电缆连接及保护以及监测数据的采集及分析。
关键词: 岩土工程, 监测仪器, 电缆连接, 数据采集
ZHONG Yi-bin, WANG Hong-yan and ZHANG Yue. Some issues on embedment technology in construction of safety monitoring project for geotechnical engineering[J]. dam, 2016, 0(2): 56-.
钟益斌,王洪岩,张 岳. 关于岩土工程安全监测工程现场埋设施工技术的几个问题分析[J]. 大坝与安全, 2016, 0(2): 56-.