dam ›› 2014, Vol. 0 ›› Issue (6): 53-56.

Previous Articles     Next Articles

Analysis on deformation of peripheral joint and treatment of Gongboxia CFRD

KONG Qing-mei, ZHANG Yi and WANG Xue-mei   

  1. Dam Management Center of Yellow River Upstream Hydropower Development Co., Ltd.
  • Received:2014-07-09 Online:2014-12-18 Published:2014-12-18

公伯峡混凝土面板堆石坝周边缝变形分析及缺陷处理

孔庆梅1,张毅2,王雪梅1   

  1. 1.黄河上游水电开发有限责任公司大坝管理中心,青海 西宁,810016;2.黄河上游水电开发有限责任公司,青海 西宁,810016
  • 作者简介:孔庆梅(1970- ),女,青海省西宁市人,工程师,主要研究方向:水电站大坝安全管理。

Abstract: By monitoring on the deformation of peripheral joint, it was found that the monitored value for the right bank varied widely during storage and formed a trend. Moreover, the opening at some monitoring points and the normal displacement were larger than the designed value. Underwater inspection was carried out and the defects on concrete face slab were found. The paper introduces the deformation of peripheral joint and the treatment. As well, the treatment effect was assessed.

Key words: Gongboxia hydropower station, concrete face slab, peripheral joint, deformation analysis, defect treatment

摘要: 公伯峡混凝土面板堆石坝周边缝变形监测中发现,右岸周边缝测缝计测值在蓄水期变化较大,且呈趋势性变化,部分测点开合度和面板法向错动超了设计控制值。为此,2011年进行了水下检查,发现周边缝变形较大部位面板混凝土存在缺陷,随即对缺陷进行了封堵处理。笔者对混凝土面板周边缝变形进行了分析,介绍缺陷处理情况,并对处理效果进行了评价。

关键词: 公伯峡水电站, 混凝土面板, 周边缝, 变形分析, 缺陷处理