Design of diversion channel of Longkaikou hydropower station

CHEN Yi-jun, REN Jin-ming and LV Guo-xuan   

  1. Huadong Engineering Corporation
  • Received:2014-07-28 Online:2014-10-28 Published:2014-10-28

龙开口水电站导流明渠设计

陈义军,任金明,吕国轩   

  1. 华东勘测设计研究院有限公司,浙江杭州,310014
  • 作者简介:陈义军(1974-),男,内蒙古乌兰察布市人,高级工程师,主要从事水电工程施工组织设计。

Abstract: Water retaining cofferdam all the year and open channel on the left bank is selected for diversion of Longkaikou hydropower station. By combination of open channel with the water retaining dam section on left bank, water would be discharged from the bottom outlet of open channel and the upper notch.

Key words: diversion channel, construction diversion, diversion bottom outlet, notch, Longkaikou hydropower station

摘要: 龙开口水电站采用全年挡水围堰、左岸明渠的导流方案。导流明渠与左岸挡水坝段结合设置,导流明渠底孔和上部缺口联合过流。

关键词: 导流明渠, 施工导流, 导流底孔, 缺口, 龙开口水电站