dam ›› 2013, Vol. 0 ›› Issue (6): 13-14.
Previous Articles Next Articles
ZHANG Xiao-bing and XING Lin-sheng
Received:
Online:
Published:
张小兵,邢林生
作者简介:
Abstract: With stable structure of spillway gate as well as normal displacement and seepage, the discharge capacity of second spillway of Zhelin dam could meet the requirements in design. Because of dense population and buildings in the tail channel area, it becomes a key problem that how to ensure the safety of life and property in condition of flood discharge. In order to minimize the loss during emergency period of flood discharge, dam operator must set up the linkage mechanism with local authorities. Further, practicable emergency plan should be made and regular maneuvers should be carried out.
Key words: second spillway, water discharge, safety analysis, linkage mechanism, Zhelin dam
摘要: 柘林大坝第二溢洪道泄洪闸结构稳定,位移和渗流运行性态正常,泄流能力满足原设计要求。但尾渠内人口稠密、房屋林立,一旦泄洪,如何保障尾渠内的人民生命财产安全是本工程泄洪运行需要重点关注的问题。因此,电厂必须与地方政府联动,制定出切实可行的防洪抢险应急预案,警钟长鸣、定期演练,以能在泄洪非常时期把损失降到最低。
关键词: 第二溢洪道, 泄洪运行, 安全分析, 联动机制, 柘林大坝
ZHANG Xiao-bing and XING Lin-sheng. Analysis on the safety of water discharge operation of the second spillway at Zhelin dam[J]. dam, 2013, 0(6): 13-14.
张小兵,邢林生. 柘林大坝第二溢洪道泄洪运行安全分析[J]. 大坝与安全, 2013, 0(6): 13-14.