Control of water level at Bashan reservoir and risk analysis

ZHUANG Cai-bao and SONG Zeng-wei   

  1. Management Bureau of Bashan Reservoir
  • Received:2013-04-11 Revised:2013-04-28 Online:2013-08-31 Published:2013-08-31

跋山水库水位控制运用及风险分析

庄才宝,宋增伟   

  1. 沂水县跋山水库管理处,山东 临沂 276400
  • 作者简介:庄才宝(1972-),男,山东沂水人,工程师,主要从事水库工程管理和水资源调度工作。

Abstract: This paper introduced the change of indexes in reservoir control and regulation before and after rehabilitation. Flood regulation calculation based on different water levels was carried out. Then, regulation indexes in flood season were determined and risks were analyzed. Accordingly, countermeasures were advanced.

Key words: reservoir level, control and regulation, risk countermeasure, analysis

摘要: 对跋山水库工程加固前后控制运用指标变化情况进行介绍,按不同起调水位标准洪水进行了调洪演算,确定了水库汛期控制运用指标,并进行了风险分析,制定了相应对策。

关键词: 库水位, 控制运用方案, 风险对策, 分析