• Rehabilitation • Previous Articles Next Articles
FENG Chao, ZHOU Honglin and ZHANG Yun-hai
Online:
Published:
冯超,周洪林,张云海
Abstract: This paper introduced the main defects of basin plate of stilling pool at Ankang hydropower station, and analysed the damage reason. Combined with former reinforcement, some suggestions on defect elimination were advanced.
摘要: 介绍了安康水电站表孔消力池底板存在的主要缺陷,分析了破坏原因、历次补强加固处理方法及效果,并提出了从根本上解决表孔消力池安全隐患的建议。
冯超,周洪林,张云海. 安康大坝表孔消力池底板破坏原因分析及补强加固处理[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2009/V0/I5/52