• Detection technology • Previous Articles     Next Articles

Safety assessment of the third subsidiary power house at Fengtan power station

JIANG Zhong-xian   

  • Online:2009-06-28 Published:2009-06-28

凤滩电站三副厂房结构安全检测与评估

蒋忠宪   

  1. 湖南省电力公司凤滩水力发电厂,湖南沅陵419600

Abstract: This article introduced the safety inspection and assessment of the structure performance of the third subsidiary factory building of Fengtan power station with kinds of methods. Further, according to measuring result, reliability analysis was carried out and guiding suggestions were advanced.

摘要: 采用多种方法对凤滩水电站三副厂房的结构性能进行安全检测与鉴定,对检测结果进行了可靠度分析并根据评定结果提出了指导性建议。