• Rehabilitation • Previous Articles     Next Articles

Cause analysis of scour hole in sediment flushing area and research on treatment measures

LIU Chang- kuai and ZHANG Zhuang- zhi   

  • Online:2007-12-28 Published:2007-12-28

葛洲坝大江电厂排沙底孔进水口门槽底坎区域冲坑成因分析及处理方法研究

刘畅快, 张壮志   

  1. 中国长江电力股份有限公司, 湖北宜昌 443002

Abstract: Howto deal with the problem of anti- sediment and decrease sediment through hydraulic turbine is always a problem. This article introduced the cause analysis and research on the way to deal with scour hole in the area of sediment flushing bottom outlet in upside check gate of Gezhouba Dajiang hydropower factory, hopefully it would be useful to similar maintenance.

摘要: 如何解决低水头径流式电站的防沙问题, 防止发电进水口淤积, 减少泥沙过机一直是水工建筑物检修的技术难点。本文通过对葛洲坝大江电厂排沙底孔上游检修门槽底坎区域冲坑成因的分析及处理方法的研究, 希望能够对同类型水工建筑物检修提供借鉴。