Abstract: The paper introduced the design, construction, supervision and management in the secondary stage anti- seepage treatment project at Luowan dam, and stressed on the design of asphalt concrete impervious face slab and foundation curtain grouting, as well as asphalt concrete test and the characteristic of project management.
摘要: 全面介绍了罗湾大坝防渗处理二期工程的设计、施工、监理和管理情况, 重点阐述了沥青混凝土防渗面板和基础帷幕灌浆的设计、沥青混凝土试验和工程管理的特点。