Previous Articles Next Articles
ZHU Zhi-cheng
Published:
朱志成
Abstract: This paper,combined with actual case,introduced the method to implement first-degree control by combination of GPS dynamic and static. And it was approved that the accuracy could satisfy the requirements of Urban Survey Regulation.
摘要: 本文结合工程实践,介绍了GPS动态、静态相结合,施测一级控制的作业方法,并经检验认为可以达到《城市测量规范》精度要求。
朱志成. 应用RTK技术施测一级控制的一种方法[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2006/V0/I增刊/46