• Operation management and rehabilitation • Previous Articles     Next Articles

Rehabilitation of Huangqian reservoir

LI Xiang- yang   

  • Online:2006-08-28 Published:2006-08-28

黄前水库除险加固

李向阳   

  1. 山东省泰安市水利勘测设计研究院, 山东泰安 271000

Abstract: Aiming at the hidden diseases of Huangqian reservoir, the strengthening measures were taken, such as the dam foundation leakage treatment, upstream and downstream slope strengthening, sluice gate pier crack treatment, anti- carbonating treatment and renovation ofmetal structure. After rehabilitation, the damsafety was improved effectively.

摘要: 根据黄前水库存在的隐患, 有针对性地提出了坝基渗漏处理及上下游坡加固、溢洪闸闸墩裂缝处理、防碳化处理及金属结构改建等加固措施, 经实施后, 有效地改善了大坝安全水平。