• Data analysis • Previous Articles     Next Articles

Deformation analysis on the cracks at the left dam abutment of Lubuge dam

FU Chun-jiang, WANG yu-jie, WANG Li-fu and ZHANG Zheng-mei   

  • Online:2005-10-28 Published:2005-10-28

鲁布革大坝左岸裂缝变形分析

傅春江1,王玉洁1,王立福2,张正梅2   

  1. 1.国家电力监管委员会大坝安全监察中心,浙江杭州 310014;2.鲁布革发电总厂,云南罗平 658000

Abstract: Based upon the analysis on the deformation at the connection section between the core wall and left spillway, the formation reason has been revealed.

摘要: 通过对鲁布革大坝心墙与左岸溢洪道结合部位变形分析,揭示了产生横向裂缝的原因,对一些监测量的物理成因做了解释,为今后类似的设计和大坝安全管理提供依据。