• Rehabilitation • Previous Articles     Next Articles

Rehabilitation for Shuidong dam

HU Yong-hong and YANG Pin   

  • Online:2005-08-28 Published:2005-08-28

水东大坝补强加固处理技术

胡永洪,杨频   

  1. 福建省尤溪流域水电开发有限责任公司,福建尤溪 365100

Abstract: Shuidong dam is a monolithic roller concrete gravity dam.It was evaluated as defective dam in 2001.It had been reinforced in 2002 and 2003.At present,the treatment effect is very well.?

摘要: 水东大坝为整体式碾压混凝土重力坝,2001年被评定为病坝,2002~2003年进行补强加固处理,目前已经取得显著成效,其处理技术对类似大坝的补强加固具有借鉴意义。