Previous Articles     Next Articles

On designing layout of metal structures in Yinzidu hydropower station

WANG Zhao-cheng and ZHANG Ai-ping   

  • Online:2004-04-28 Published:2004-04-28

引子渡水电站金属结构布置及设计

王兆成,张爱萍   

  1. 国家电力公司贵阳勘测设计研究院,贵州贵阳 550002

Abstract: This article introduces the design,type selection and layout of gate and headstock gear, its arrangement is presented as well. The authors have come up with the importance of the gate of flood-discharge system which should be fully considered in de-signing.?

摘要: 本文概述了引子渡水电站闸门及启闭机的设计、选型和布置情况,对启闭机的配置进行了介绍,提出在设计时要充分考虑泄洪系统闸门的重要性。