• Data analysis • Previous Articles     Next Articles

Analysis on rebuilding effect of Taipingshao collimation dam deformation measuring system

JING Xiu-yan and LI Shu-fa   

  • Published:2004-02-28

太平哨真空激光准直测坝变形系统改造效果分析

荆岫岩1,李树发2   

  1. 1.东北电力科学研究院,沈阳 110006;2.太平哨发电厂,辽宁宽甸 118200

Abstract: Through analysis of the observing data from the rebuilding system, the rebuilding effect is evaluated, the rebuilding is considered to be successful.?

摘要: 通过对太平哨真空激光准直测坝变形系统改造后的观测数据分析,对改造的效果进行了评价.认为系统的改造是成功的.