• Safety detection • Previous Articles     Next Articles

Safety detection for cracks on spillway face of Fengman Hydropower Station

Zhang Zhen-xia, Li Ping and Yaocheng-lin et.al   

  • Online:2001-10-28 Published:2001-10-28

丰满水电站溢流坝坝面裂缝安全检测

张震夏1,李平1,姚成林1,陈昌林2,李正国2,李才2   

  1. 1.中国水利水电科学研究院,北京 100038;2.丰满发电厂,吉林 132108

Abstract: This paper briefly introduces a new method of non-destructive detection in dam safety inspection. This paper also expounds its principle,facilities and method as well. The condition and result of crack detection have been discussed.?

摘要: 本文简要介绍一种大坝安全检查的新方法——无损检测方法的原理、设备与方法,并阐述了对丰满大坝裂缝进行检测的情况及其结果。