ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2019 ›› Issue (5): 5-.

• 运行管理 • 上一篇    下一篇

黄壁庄水库冰壅危害及防治措施

周爱山,刘  斌   

  1. 黄壁庄水库管理局,河北  石家庄,050000
  • 收稿日期:2019-04-24 修回日期:2019-05-20 出版日期:2019-10-08 发布日期:2019-10-08
  • 作者简介:周爱山(1974— ),男,河北石家庄人,高级工程师,主要从事工程管理工作。
  • 基金资助:
    国家重点研发计划(2018YFC0407104)

Hazards of ice jam and countermeasures for Huangbizhuang reservoir

ZHOU Aishan and LIU Bin   

  1. Huangbizhuang Reservoir Management Bureau
  • Received:2019-04-24 Revised:2019-05-20 Online:2019-10-08 Published:2019-10-08

摘要: 黄壁庄水库主、副坝较长,每年冬季坝坡受库面冰冻破坏,防冰冻破坏任务艰巨。根据黄壁庄水库冰壅破坏过程及其特点,对冰压力作用进行深入分析,有针对性地提出并实施冰壅危害防治措施。多年运行表明,黄壁庄水库冰壅危害防治措施效果显著,有良好的工程应用价值。

关键词: 冰壅, 冰推, 冰拔, 防治措施

Abstract: The main dam and the auxiliary dam of Huangbizhuang reservoir are long. Every winter, the dam slope is damaged by the freezing of reservoir water, thus the freezing damage prevention is an arduous task. Based on the failure process and its characteristics of ice jam at Huangbizhuang reservoir, the ice pressure effect is analyzed. As well, its hazard prevention and countermeasures are proposed and implemented. Years of operation shows that the prevention and countermeasures of ice jam for Huangbizhuang reservoir are of good effect and of significant engineering application value.

Key words: ice jam, ice push, ice pull, countermeasure