大坝与安全 ›› 2019 ›› Issue (4): 7-11.

• 运行管理 • 上一篇    下一篇

二滩水电站下游雾化区高边坡变形破坏机理浅析

杨银辉,韩先宇,闵四海,吴文勇   

  1. 雅砻江流域水电开发有限公司,四川 成都,610051
  • 收稿日期:2019-04-27 出版日期:2019-08-30 发布日期:2019-08-30
  • 作者简介:杨银辉(1983-),男,湖南宁乡人,高级工程师,从事水电站大坝安全管理工作。

Analysis on deformation and failure mechanism of high slope in atomization area downstream of Ertan Hydropower Station

YANG Yin-hui, HAN Xian-yu, MIN Si-hai and WU Wen-yong   

  1. Yalong River Hydropower Development Company, Ltd.
  • Received:2019-04-27 Online:2019-08-30 Published:2019-08-30

摘要: 二滩水电站大坝下游两岸工程边坡开口线以上多处天然边坡发生变形破坏。通过对变形破坏区的地质条件和泄洪雾化影响进行分析,发现谷坡浅层松弛岩带是边坡变形破坏的内因,降雨及泄洪雾化积水是边坡变形破坏的外因。

关键词: 高边坡, 变形破坏机理, 泄洪雾化

Abstract: Slope deformation and failure were existed above the opening line of downstream banks of Ertan Hydropower Station Dam. Engineering geological conditions of destruction areas and impacts of flood discharge atomization are analyzed. It is found that slope deformation and failure is mainly controlled by the shallow relaxation zone of valley slope and the atomization of rainfall and flood discharge. The shallow rock zone of the valley slope is the decisive factor, and the atomized water creates favorable boundary conditions for the deformation and failure of the slope.

Key words: high slope, deformation and failure mechanism, flood discharge atomization