大岗山拱坝初期蓄水变形监测成果分析

袁文熠,张业辉,王 滔   

  1. 国电大渡河流域水电开发有限公司,四川 成都,610041
  • 收稿日期:2016-09-11 修回日期:2016-11-21 出版日期:2016-12-08 发布日期:2016-12-08
  • 作者简介:袁文熠(1989- ),男,四川南充人,工学硕士,从事安全监测管理工作。

Analysis on deformation of Dagangshan arch dam during initial impoundment

YUAN Wen-yi, ZHANG Ye-hui and WANG Tao   

  1. Dadu River Hydropower Development Co., Ltd.
  • Received:2016-09-11 Revised:2016-11-21 Online:2016-12-08 Published:2016-12-08

摘要: 根据大岗山水电站大坝及坝基变形成果,研究了大岗山混凝土双曲拱坝初期蓄水的变形分布特征和发展变化规律,分析了大岗山水电站蓄水期的工作形态。监测成果表明,大坝及坝基变形符合一般规律,量值在设计控制指标范围以内,其变形监测成果对其他特高拱坝具有重要的参考价值。

关键词: 大岗山拱坝, 初期蓄水, 监测变形成果分析

Abstract: Based on the deformation of body and base of Dagangshan arch dam, the distribution characteristic as well as its development and change rule during initial impoundment is studied. Then its working behavior in storage period is analyzed. Monitoring results indicates that the deformation of body and base conforms to the general rule, and the numeric value stays in the designed control scope, which is worthy reference for other super-high arch dams.

Key words: Dagangshan arch dam, initial impoundment, analysis on deformation monitoring data