大坝与安全 ›› 2016 ›› Issue (2): 45-.
• 设计与施工 • 上一篇 下一篇
马志军1,李晓庆2,俞 伟2
收稿日期:
出版日期:
发布日期:
作者简介:
MA Zhi-jun, LI Xiao-qing and YU Wei
Received:
Online:
Published:
摘要: 以新疆齐古水库导流洞后消力池高、薄挡土墙为研究对象,借助ABAQUS软件对其加固方案进行有限元分析和比选,得到最优的拉杆布置形式。分析结果表明:消力池大部分部位为受压状态,局部拉应力区控制在规范允许范围内,拉杆支撑后结构应力分布均匀,变形量不大,满足设计要求,为解决实际工程中结构加固问题提供了参考依据。
关键词: 消力池, 拉杆, 挡土墙, 拉应力, 有限元分析
Abstract: ABAQUS simulation-based optimization for reinforcement of high and thin retaining wall was adopted in the case of stilling basin side-walls behind the diversion tunnel of Qigu reservoir in Xinjiang. The best solution using bars strengthening was obtained. The results showed that most parts of the stilling basin was in compression state, the value of local tensile stress was controlled within the allowable range of the Specification, stress distribution of the structure became uniform, and the deformation was reduced. This method provided a reference for solving structural reinforcement in practical projects.
Key words: stilling basin, tie bar, retaining wall, tensile stress, FEM analysis
马志军,李晓庆,俞 伟. 基于ABAQUS 模拟的消力池边墙加固方案优化[J]. 大坝与安全, 2016, 0(2): 45-.
MA Zhi-jun, LI Xiao-qing and YU Wei. ABAQUS simulation-based optimization for reinforcement of stilling basin side-wall[J]. dam, 2016, 0(2): 45-.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2016/V0/I2/45