• 资料分析 • 上一篇 下一篇
张峰
出版日期:
发布日期:
ZHANG Feng
Online:
Published:
摘要: 发电引水系统由混凝土现浇(无钢衬)高压隧洞段、压力钢管(钢衬)段组成,全长427.43 m。通过对实测资料的分析,掌握了系统应力应变的变化规律及工作性态,为安全发、供电提供了保障。
Abstract: The water diversion system consists of cast-in-situ concrete high-pressure tunnel (without lining) and penstock (with lining), which is 427.43 m-long. By analysis on monitoring data, we understood its change laws about strain and stress as well as its operation, worthy reference.
张峰. 新疆某工程发电引水系统运行性态分析评价[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2012/V0/I4/26