• 监测技术 • 上一篇 下一篇
许勇1, 王波2
出版日期:
发布日期:
XU Yong and WANG Bo
Online:
Published:
摘要: 引子渡水电站于2003 年4 月下闸蓄水。通过开展水库诱发地震及库岸稳定监测, 掌握了库岸变形情况, 并对库岸进行了及时保护, 保障了村民的正常生产和生活。
Abstract: Yinzidu hydropower station began ponding in April, 2003. Through reservoir induced earthquake and dam banks' stability monitoring and protection, the situation about reservoir bank’s deformation was known in time. In this way, normal life and production of the villagers living around the reservoir bank was ensured.
许勇, 王波. 引子渡水电站水库诱发地震及库岸稳定[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2006/V0/I5/37