• 设计研究 • 下一篇
王锋辉
出版日期:
发布日期:
WANG Feng- hui
Online:
Published:
摘要: 本文介绍了二滩水电站水垫塘的设计和运行情况, 以及水垫塘安全运行监测的新思路和新方法。
Abstract: Design and operation of plunge pool at Ertan hydropower station was introduced and application of the plunge pool in Ertan was analyzed. A newconcept and method for monitoring safety operation of the plunge pool were suggested.
王锋辉. 二滩水电站水垫塘设计及安全运行管理[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2006/V0/I5/1