ISSN 1671-1092 CN 33-1260/TK

• 运行管理与补强加固 • 上一篇    下一篇

天荒坪电站6 号钢管外排水管问题的分析

周民权, 焦修明   

  1. 华东天荒坪抽水蓄能有限责任公司, 浙江安吉 313302
  • 出版日期:2006-08-28 发布日期:2006-08-28

Analysis on the sixth steel pipe' s outside drain pipe of Tianhuangping power station

ZHOU Min- quan and JIAO Xiuming   

  • Online:2006-08-28 Published:2006-08-28

摘要: 近期天荒坪电站6 号机引水钢管外排水管排水量偏大, 有增加趋势, 并且发现排水夹带出碎石粒、沙、水泥灌浆结石和少量泥状物。这种现象是不正常的。对此, 作者根据设计意图和观测、试验成果, 对其原因、可能产生的后果进行分析并提出处理建议。

Abstract: Recently, the water discharge of the sixth steel pipe' s outside drain pipe of Tianhuangping pumped storage power station is on a high level , and the discharge is increasing .Further more , small detritus, sand, cement concretion and a little earth are carried out by the drainage. This phenomenon is abnormal. According to this problem, the author analyzed the causation along with the possible consequence and advanced disposal suggestion based on the design intent, the observation and test achievements.