• 补强加固 • 上一篇 下一篇
班国德
出版日期:
发布日期:
BAN Guo- de
Online:
Published:
摘要: 针对唐村水库坝体存在的渗漏和干砌石护坡施工难度大等问题, 应用混凝土防渗墙技术和分割线控制坡比施工新工艺, 较好地解决了大坝工程防渗和干砌石护坡施工难的问题。
Abstract: The leakage occurred in dambody of Tangcun reservoir and the construction of dry stone pitching was difficult to be performed. To solve these problems, the newtechniques of the concrete anti- seepage wall and the controlling slope ratio with separation line were applied during construction.
班国德. 唐村水库除险加固施工简介[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2006/V0/I2/48