ISSN 1671-1092 CN 33-1260/TK

• 水库调度 • 上一篇    下一篇

白盆珠水库提高正常蓄水位可行性分析

曾朝晖   

  1. 白盆珠水库工程管理局,广东惠州 516341
  • 出版日期:2006-02-28 发布日期:2006-02-28

Feasibility analysis on raising normal water level in Baipengzhu reservoir

ZENG Zhao-hui   

  • Online:2006-02-28 Published:2006-02-28

摘要: 从白盆珠水库在运行过程中存在的问题入手,提出提高水库正常蓄水位0汛限水位2,利用部分防洪库容,拦蓄洪水用于兴利的必要性和可行性。

Abstract: The author has come up with a standpoint in this article about raising the normal water level (limited level during flood) for using part of flood storage to impound inflow for profit. The necessary and feasibility are stated.