ISSN 1671-1092 CN 33-1260/TK

• 运行管理 • 上一篇    下一篇

金河水电站厂房地基渗水原因及危害性分析

李华1,何少云2   

  1. 1.西藏电力公司,西藏拉萨 850000;2.华东电网有限公司新安江水力发电厂,浙江建德 31 1600
  • 出版日期:2005-04-28 发布日期:2005-04-28

Analysis on seepage at powerhouse foundation and harmfulness in Jinhe hydropower station

LI Hua and HE Shao-yun   

  • Online:2005-04-28 Published:2005-04-28

摘要: 针对金河水电站厂房及厂区特殊的工程地质和水文地质条件,分析了厂房地基渗水产生的原因和主要渗水来源,提出加强监测厂房运行和维护检修排水设施等建议。

Abstract: Aiming at the special engineering geological and geohydwlogical condition at the location of powerhouse and its section in Jinhe hydropower station, the reason and main resources resulting in foundation seepage have been analyzed. Some suggestions have been come up with such as strengthening monitoring the operation of powerhouse, maintaining the drainage equipment and etc.