陆水试验水利枢纽主坝闸墩加固

陈明祥1,4,黄本忠2,常晓林3何英明1,4   

  1. 1.武汉大学土木建筑工程学院,武汉 430072;2.长江水利委员会陆水试验枢纽管理局,湖北赤壁 430033;3.武汉大学水利水电学院,武汉 430072;4.武汉武大巨成加固实业有限公司,武汉 430077
  • 发布日期:2004-12-28

Reinforcement of dam piers in Lushui hydro project

CHEN Ming-xiang, HUA NG Ben-zhong and CHANG Xiao-lin et al.   

  • Published:2004-12-28

摘要: 陆水水利枢纽主坝闸墩下部出现数量不等的裂缝,部分裂缝已延伸到溢流坝面,并有继续发展的趋势。为了解裂缝形成的原因,本文进行了三维有限元分析,在此基础上,对三种不同加固方案进行分析比较,最后确定外粘钢板加固方案较合理。

Abstract: There are a variety of cracks occurred in the lower part of main dam pier, of which some have extended to the surface of overflow dam and developed on. In order to realize the reasons of crack forming the 3-D FEM analysis has been performed, and three different reinforcement schemes are compared on the basis of the analysis. The scheme of sticking steel sheet outer has been carried out finally.