ISSN 1671-1092 CN 33-1260/TK

• 渗流、应力应变监测 • 上一篇    下一篇

三峡左岸机组蜗壳保温加压监测

姚红兵,於三大   

  1. 中国长江三峡工程开发总公司,湖北宜昌 443133
  • 发布日期:2004-08-28

Analysis on monitoring resuh in heat preserved and pressure loaded for unit spiral case of TGP

YAO Hong-bing and YU San-da   

  • Published:2004-08-28

摘要: 本文对蜗壳充水保温加压及卸压过程进行了分析。加压后,钢板拉应力增大;卸压后各仪器总体变化规律表现为蜗壳拉应力减小,蜗壳与混凝土的缝隙增大,周边混凝土和钢筋压应力增大。卸压后缝隙最大开度出现在低温季节,最小开度出现在夏季。通过分析认为左厂房机组蜗壳工作性态正常,应力和变形均在设计允许范围内。

Abstract: The article analyzes the process of filling water and heat preserving and pressure loading & unloading to the spiral case. Loading a pressure to the spiral case, the tension stress of steel plate increases; while unloading, total changing regulation of all instruments shows that the tensile stress decreased,and the joint between the spiral case and the concrete enlargeed,and the compressive stress of the perimetric concrete and steel bars increased.After unloading,the maximum joint took place in the cool seasons, and the minimum joint in the summer. Through analysis, we consider that the spiral case of left powerhouse units works normally, and that the stress and deformation are within the range of allowable design.