引子渡水电站溢洪道岩锚墙锚索施工

王连喜   

  1. 江南水利水电工程公司引子渡项目部,贵州平坝 561105
  • 出版日期:2004-04-28 发布日期:2004-04-28

Anchor cable constructing for spillway anchored rock wall in Yinzidu hydropower station

WANG Lian-xi   

  • Online:2004-04-28 Published:2004-04-28

摘要: 在引子渡水电站溢洪道开挖过程中,预留岩锚墙发生失稳,对岩锚墙采用预应力锚索进行加固处理,由于正确的施工方法,施工各工序衔接紧密,锚固处理取得了良好的效果,为溢洪道顺利开挖赢得了宝贵的时间。

Abstract: Retained in advance rock anchored wall between the dam and the spillway of Yinzidu hydropower station had been situ-ated an un-stable condition during excavation,pre-stressed anchor cable is adopted for anchored rock wall treatment.?