ISSN 1671-1092 CN 33-1260/TK

• 贵州引子渡水电站工程建设专辑 • 上一篇    下一篇

引子渡水电站溢洪道混凝土施工及质量控制

童泽林   

  1. 中国水利水电第九工程局引子渡项目部,贵州贵阳 550002
  • 出版日期:2004-04-28 发布日期:2004-04-28

Spillway concrete construction in Yinzidu hydropower station and quality control

TONG Ze-lin   

  • Online:2004-04-28 Published:2004-04-28

摘要: 引子渡水电站溢洪道混凝土施工采用了多种混凝土人仓方案,为了提高溢洪道运行期的使用寿命,在施工过程中,从原材料到各施工工序均进行严格控制,确保溢洪道棍凝土施工质量。

Abstract: A variety of concrete casting schemes were adopted in concrete construction in Yinzidu project.In order to improve the using age of spillway in operation,we strictly controlled from materials selecting used by construction to working procedure to en-sure the concrete construction quality of spillway.?