• 贵州引子渡水电站工程建设专辑 • 上一篇 下一篇
杨志雄,胡世奎
出版日期:
发布日期:
YANG Zhi-xiong and HU Shi-kui
Online:
Published:
摘要: 本文介绍了在设计中通过坝型选择,枢纽布置调整,不断进行设计优化.为降低工程投资、缩短建设工期、高质量快速建成该电站所做的工作。
Abstract: Yinzidu hydropower station is one of the first group of west-electricity-transmitted-to-the-east projects.In designing,we have continuously optimized design by selecting dam type and regulating hydraulic layout and so on,which made a great contri-bution to project construction in high quality,lower investment and short construction stage.?
杨志雄,胡世奎. 引子渡水电站的设计与优化[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2004/V0/I2/11