ISSN 1671-1092 CN 33-1260/TK

• 机电与金属结构 • 上一篇    下一篇

扩大单元接线中发电机断路器并联电容器设置方案探讨

赵水荣   

  1. 紧水滩水力发电厂,浙江丽水 323000
  • 发布日期:2003-08-28

On parallel connection capacitor setup of generator circuit breaker in enlarged unit connection

Zhao Shui-rong   

  • Published:2003-08-28

摘要: 本文针对发电机一变压器组扩大单元接线中发电机断路器并联电容器设置方式在运行中存在的问题,提出调整电容器设置使系统可靠运行的方案。

Abstract: This article has come up with the scheme of adjusting capacitor setup to make system safe operation based on the defects of capacitor parallel connection setup of generator circuit breaker in enlarging unit connection of generator and transformer group.?