三峨工程左岸电站4#机组蜗壳水压实验全过程监测分析

张志诚1,张怡1,李桃凡2   

  1. 1.河海大学水电学院,南京 210098;2.中国水利水电第八工程局,长沙 410077
  • 发布日期:2003-04-28

Pressure test for spiral case of 4# turbine in Three Gorges Project

Zhang Zhi-cheng, Zhang Yi and Li Tao-fan   

  • Published:2003-04-28

摘要: 通过对三峡工程左岸电站4#机组蜗壳水压实验的全过程监测,分析蜗壳关键断面在加压、保压以及卸压过程中的钢板应力状况,得出蜗壳在整个过程中的应力变化及分布规律。为蜗壳充水加压、保温保压下二期混凝土施工及蜗壳自身的承载情况提供了依据。?

Abstract: In this paper, the stress distribution of the spiral case of 4 # turbine in left powerhouse is analyzed through monitoring of the stress of the key section of the spiral case in the process of the pressure test. The stress distribution and its rules of the spiral case are studied in the pressure test. These can provide criterion for the design of concreting with water in the spiral case for taking on load.?