ISSN 1671-1092 CN 33-1260/TK

• 补强加固 • 上一篇    下一篇

五强溪水电厂三级船闸结构缝漏水处理

邓文兵   

  1. 五强溪水电厂,湖南沅陵 419642
  • 发布日期:2003-02-28

Leakage treatment for structure cracks in 3rd grade lock of Wuqiangxi Powerplant

Deng Wen-bing   

  • Published:2003-02-28

摘要: 介绍了五强溪水电厂三级船闸结构缝漏水情况及止漏处理过程,并对止水材料和防水止水施工工艺进行了介绍。

Abstract: Leakage through the structure cracks in the third grade lock and treatment for it are introduced in this paper. The sealing material and its construction technique are presented as well.