ISSN 1671-1092 CN 33-1260/TK

• 运行管理 • 上一篇    下一篇

成屏混凝土面板堆石坝的监测、运行和维护

罗谊深   

  1. 成屏水力发电厂,浙江遂昌 323300
  • 发布日期:2002-12-28

Monitoring,operation and maintenance of Chengping Concrete Slab Rockfill Dam

Luo Yi-shen   

  • Published:2002-12-28

摘要: 成屏混凝土面板堆石坝是国内首批兴建的混凝土面板堆石坝之一,已安全运行13a,积累了一定的运行管理经验。本文主要介绍了成屏面板坝的监测、运行、维护情况,并对在运行过程中所遇到的一些问题进行了分析。可供同类型坝的施工和运行管理参考。

Abstract: Chengping Concrete Slab Rockfill Dam is one of the earliest construced concrete slab rockfill dam. It has safely operated 13 years and accumulated certain operation and management experiences. This paper mainly introduced monitoring, operation and maintenance of Chengping Slab Dam, and introduced the author’s understandings for the problems during operation.?