ISSN 1671-1092 CN 33-1260/TK

• 抽蓄电站研究 • 上一篇    下一篇

关于抽水蓄能电站的水准高程控制测量

王瀛勇1,何惠生1,张松林2,张正禄2,张军2   

  1. 1.华东勘测设计研究院测绘研究分院,杭州 310030;2.武汉大学测绘学院,武汉 430079
  • 发布日期:2002-10-28

Research on leveling vertical control network to pumped storage stations

Wang Ying-yong, He Hui-sheng and ZHANG Song-lin, et al.   

  • Published:2002-10-28

摘要: 针对抽水蓄能电站施工控制网的特点,论述了用二等水准测量进行高程控制的必要性,对泰安、桐柏和宜兴三个网的水准高程控制测量设计、实施和成果进行了比较分析。

Abstract: This paper introduces the important of second grade leveling for setting up of the construction control of pump storage hy-dropower stations. It compares and analyzes the design and results of second grade leveling for three pump storage hydropower stations.?