• 运行管理 • 上一篇 下一篇
安小敏
发布日期:
An Xiao-min
Published:
摘要: 本文根据克孜尔水库库区断面泥沙淤积测量成果%并结合水库运行方式,提出改变水库运行方式、汛期水库低水位运行并利用异重流排沙的方案。
Abstract: In this paper, the scheme altering the model of reservoir operation,operating at low level in flood-peroid and desilting by density flow have been put forword on the basis of cross-section measurement result of sedimentation at reservoir area in Kezhi’er Reservoir?
安小敏. 克孜尔水库库区泥沙淤积现状及排沙方案[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2002/V0/I4/10