水口水电站船闸水平位移观测精度分析及方法探讨

温文富   

  1. 福建水口发电有限公司,福州 350013
  • 发布日期:2002-06-28

Accuracy analysis on horizontal displacement observation for gate of Shuikou Hydropower Station

Wen Wen-fu   

  • Published:2002-06-28

摘要: 本文对水口水电站船闸水平位移人工观测精度进行了分析,并对观测方法做了探讨,指出了水口船闸人工观测存在的缺陷,采用自动化观测是优化大型水利建筑物变形监测系统的最佳方案。

Abstract: In this paper the observation accuracy of horizontal displacement by manual to the gate of Shuikou Hydropower Station has been analyzed and the observation method has been also discussed, which indicate the defects by manual observation. It is proved to be the most favorable scheme to optimize the monitoring system for large hydraulic structures deformation using automatic observation.?