Previous Articles Next Articles
YANG Zhi-xiong and HU Shi-kui
Online:
Published:
杨志雄,胡世奎
Abstract: Yinzidu hydropower station is one of the first group of west-electricity-transmitted-to-the-east projects.In designing,we have continuously optimized design by selecting dam type and regulating hydraulic layout and so on,which made a great contri-bution to project construction in high quality,lower investment and short construction stage.?
摘要: 本文介绍了在设计中通过坝型选择,枢纽布置调整,不断进行设计优化.为降低工程投资、缩短建设工期、高质量快速建成该电站所做的工作。
杨志雄,胡世奎. 引子渡水电站的设计与优化[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2004/V0/I2/11