Technology on pile foundation construction in solution caveru developed area

LIU Gui-ping and LIU Chun-hua   

  • Published:2004-06-28

溶洞发育区某工程桩基的施工

刘贵平1,刘春华2   

  1. 1.江西金源地质工程有限公司,江西鹰潭 335003;2.江西省水电工程局,江西南昌 330001

Abstract: This paper presents the case of pile foundation construction in solution cavern developed area, analyzing the outline on constructing in solution cavern area and problems occurred during construction. It also introduces the operation steps in detail.?

摘要: 本文通过江西梨温高速公路浙赣铁路分离立交桥及罗桥分离立交桥溶洞发育区的施工实例,分析了灰岩溶洞区施工的要点及施工过程中所遇到的种种情况,并详细地介绍了具体施工过程。