• Operation management • Previous Articles     Next Articles

Necessary of setting lowenng or unwatenng reservoir system for hydro projects

NIE Guang-ming and XING Lin-sheng   

  • Published:2004-10-28

水电站枢纽工程设置降低或放空水库设施的必要性

聂广明,邢林生   

  1. 国家电力监管委员会大坝安全监察中心,杭州 310014

Abstract: This paper has reviewed the history and status in setting lowering water level or unwatering reservoir establishment for hydro projects in China, introduces several typical projcots which have set unwatering establishment in emergency accident usage, and difficulties of reinforcement without that. The existing issues on design, construction and operation of unwatering system are pointed out in this paper and the conditions of setting unwatering establishment are discussed as well.

摘要: 本文回顾了我国水电站枢纽工程设置降低或放空水库设施的历史和现状,介绍了几座典型工程设置放空水库设施在大坝紧急事故处理中的作用以及无放空设施给大坝加固处理带来的困难,指出了放空设施在设计、施工和运行中存在的问题,讨论了水电站枢纽工程设置放空设施的条件。