Abstract: Aiming at the special engineering geological and geohydwlogical condition at the location of powerhouse and its section in Jinhe hydropower station, the reason and main resources resulting in foundation seepage have been analyzed. Some suggestions have been come up with such as strengthening monitoring the operation of powerhouse, maintaining the drainage equipment and etc.
摘要: 针对金河水电站厂房及厂区特殊的工程地质和水文地质条件,分析了厂房地基渗水产生的原因和主要渗水来源,提出加强监测厂房运行和维护检修排水设施等建议。
李华,何少云. 金河水电站厂房地基渗水原因及危害性分析[J]. .