Non-uplift wire alignment monitoring automation system in Gezhouba hydropower station

ZHOU Shi-tao, ZHAO Jian-hua and ZHENG Rong-zhou et al   

  • Online:2005-08-28 Published:2005-08-28

无浮托引张线自动化观测系统在葛洲坝水电站的应用

周诗涛1,赵建华1,郑荣洲1,夏一强2   

  1. 1.中国长江电力股份有限公司,湖北宜昌 443002;2.长春市朝阳监测技术研究所,吉林长春 130061

Abstract: This article introduces the first set of CZY non-uplift wire alignment monitoring automation system,including its working principle and constitutes.In combination with the test and operation in Gezhouba hydropower station,it has analyzed the accuracy index to which the system is up,reliability and stability.This system avoided the problems of being disturbed and limited by uplift equipment before,improving the reliability and accuracy of that,reducing the maintenance workload.This system truly realized wire alignment monitoring automation.?

摘要: 本文介绍了我国第一套CZY无浮托引张线自动化观测系统的工作原理及其组成,并结合该系统在葛洲坝水电站的测试和运行,分析了系统能够达到的精度指标、可靠性及稳定性。该系统避免了以往引张线观测系统中浮托装置的限制和干扰,提高了系统的可靠性和观测精度,减少了系统维护的工作量,实现了真正意义上的引张线自动化观测。