Application  of underwater  engineering  technology  in  the  continued  construction  of  Huanggou pumped storage power station

 by  GE Lei, ZHU Difa, ZHANG Guohui,  WANG Jianan,  WANG Zigeng and LU Xiangda   

  1. Qingdao Pacific Diving & Technology Co., Ltd.
  • Online:2025-08-30 Published:2026-01-30

水下施工技术在荒沟抽水蓄能电站续建中的应用

葛 磊,朱迪发,张国辉,汪佳男,王自耕,卢向达   

  1. 青岛太平洋水下科技工程有限公司,山东 青岛,266100

Abstract: The lower reservoir of Huanggou pumped storage power station is the existing Lianhua reser- voir. The inlet/outlet structure of the lower reservoir constructed in early stage has been submerged. The continued project is the first domestic hydraulic structure that adopts underwater construction technolo- gy. A camera system for turbid water is developed during construction, and construction tech such as un- derwater formwork positioning and installation, underwater welding of steel bars and underwater concret- ing by placing machine are used. A underwater sealing device for gate well is designed to achieve dry construction for embedded parts and the phase Ⅱ concrete.

Key words: extension project, camera system for turbid water, underwater formwork positioning and in- stallation, underwater concreting, gate well sealing, dry construction

摘要: 荒沟抽水蓄能电站下水库为已建的莲花水电站水库,前期施工的下水库进/出水口结构已被淹没,续建工程为国内水工建筑物采用水下建造技术的首例。施工中研制了浑水摄像系统,采用了水下模板定位安装、钢筋水下焊接、布料机浇筑水下混凝土等施工技术,并设计采用了闸门井水下封闭装置,实现了闸门井内埋件和二期混凝土的干地施工。

关键词: 续建工程, 浑水摄像系统, 水下模板定位安装, 水下混凝土浇筑, 闸门井封闭, 干地施工