• Data analysis • Previous Articles Next Articles
Maimaiti, SHEN Zhen-zhong, XIA Xin-li and et al.
Online:
Published:
买买提1,沈振中2,夏新利1,祖丽菲娅1
Abstract: In this paper, monitoring data of piezometric level, pore water pressure and seepage of main dam was analyzed, as well, dam safety was evaluated. The analysis result indicated the problem of the bad seepage flow behavior of right dam abutment existed.
摘要: 根据工程实际情况,详细分析了主坝坝体测压管水位、孔隙水压力、渗流量等观测资料,从安全监测的角度评价了主坝的运行状态。分析表明了主坝右肩存在渗流稳定问题。
买买提,沈振中,夏新利,祖丽菲娅. 克孜尔水库主坝渗流监测资料分析[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2009/V0/I1/70