Analysis on construction scheme of intelligent runoff gauging station for pumped storage power stations

GAO Lilun, ZHU Weifeng and HUANG Qiang
  

  1. PowerChina Renewable Energy Co., Ltd.
  • Received:2021-09-08 Revised:2022-07-12 Online:2023-10-20 Published:2024-01-09

服务于抽水蓄能电站的智能化径流站建设方案浅析

高利伦,朱伟锋,黄 强
  

  1. 中电建新能源集团股份有限公司,浙江 杭州,310030
  • 作者简介:高利伦(1985—),男,山东菏泽人,高级工程师,主要从事抽水蓄能、风能和光伏资源电站开发工作。

Abstract:

At present, some pumped storage power stations are built on small and medium-sized rivers with abundant rainfall and small drainage area, usually without operating hydrological stations. Therefore, the reference station data or local rainstorm atlas are often used to calculate the design flood of the basin, which is equivalent to establishing a theoretical model for the basin. The obtainance of some theoretical formula parameters depends on empirical values, such as roughness. The author analyzes the con⁃
struction of experimental intelligent runoff gauging station based on radar wave online flow measurement
as the core test method, to verify the theoretical model with measured data.